Truss Style Clarifier Bridge
In stock
Reconfirm the price with seller
- Customer pickup,
- Courier
- In detail
Products of other enterprises
Description
60' long access bridge for clarifier tank at Magnesia processing plant. Bridge has lower level for piping runs with fiberglass grating walkway. Due to the caustic nature of the environment the finish consisted of abrasive blasting the surface to SP10 followed by a coat of inorganic zinc primer followed by epoxy primer with a polyurethane top coat.
Contact the seller
Truss Style Clarifier Bridge
We recommend to see